Freeman Public Schools

Project Concept Plan

New Additions

West Entrance

Kitchen_Commons

RENOVATION

The project includes an 18,376-square-foot renovation to Freeman's West entrance, kitchen, and commons area. It also includes minor renovations and classroom adjustments throughout the building.

RENOVATION FEATURES

  • The current West entrance and kitchen are renovated into a safe and secure entrance, reception desk, and district office.

  • A portion of the North wing is renovated into a NEW kitchen.

  • A portion of the North wing is renovated into an expanded cafeteria/commons.

  • The current preschool classroom and mobile lab space become a dedicated space for the Falcon Program and expanded storage.

  • The current technology production studio is converted into a classroom.

  • The current Special Education Life Skills classroom is converted into a technology production studio.

  • A current Science classroom is converted into a Special Education Life Skills classroom.

  • The current weight room and wrestling room are connected through existing windows.

CTE ADDITION

The project includes a 10,870-square-foot Career and Technical Education (CTE) facility connected to the South of the current Ag classroom.

CTE ADDITION FEATURES

  • A NEW Career and Technical Education (CTE) facility on 9th includes a metals shop, woods shop, and two classroom areas.

  • The Metals shop includes a designated area for welding and vehicle lift.

  • The Woods shop includes open project space, a finishing room, and a dust collection system.

  • Two (2) classroom areas.

CTE ADDITION IMAGES

PK/CLASSROOM ADDITION

The project includes a 24,550-square-foot preschool and classroom addition on the northeast side of the facility, connecting to the East wing.

PK/CLASSROOM ADDITION FEATURES

  • Two (2) Preschool learning areas with outside entrances and access to 8th Street.

  • A space for a dedicated preschool playground area.

  • Six (6) 1st-floor classrooms

  • Two (2) 2nd-floor classrooms

  • One (1) 2nd-floor small group learning area

  • Two (2) 2nd-floor Science classrooms

PK/CLASSROOM ADDITION IMAGES

FUTURE GROWTH

The project concept plan allows for future classrooms to be build south of the elementary if/when needed.

AREA DESIGNATED FOR FUTURE GROWTH

  • The feedback received from parents, patrons, and staff indicated the need for a plan for future growth in the elementary.

  • The project concept plan allows for additional elementary classrooms to be built on the east side of the CTE facility (south of the current elementary) if and when needed.

Future Growth

PROJECT HIGHLIGHTS

NEW CAREER AND TECHNICAL EDUCATION FACILITY

NET GAIN OF NINE (9) CLASSROOMS AND THREE (3) LEARNING SPACES

NEW PRESCHOOL

SAFE & SECURE WEST ENTRANCE

EXPANDED KITCHEN

EXPANDED CAFETERIA AND COMMONS

ADDITIONAL UPDATES THROUGHOUT THE BUILDING